Load-bearing tensioning membrane for loading ramps
On behalf of TAQA Onshore BV, Buitink Technology produced and installed tensioned membrane and steel cable systems for the loading dock of the gas storage in Bergermeer, The Netherlands.
Material
The membrane is made of the TX30 of Serge Ferrari, having a warranty of 25 years!
Project data:
Surface: | Approximately 700 sqm |
Material: | Serge Ferrari TX 30 (type III en V) |
Client: | TAQA Onshore BV |
Design: | Jinx Architecten and Tentech |
Tensioned membrane: | Buitink Technology |
Steel structure: | Oving |
Year of implementation: | 2015 |
Mounting membrane
Watch the movie and discover how the loading dock was installed:
More information
Call Buitink Technology: +31 316 25 08 30, email: [email protected] or leave your contact information: