Home > Projects > Tensioned Membrane Bergermeer

Tensioned Membrane Bergermeer

On behalf of TAQA Onshore BV, Buitink Technology produced and installed tensioned membrane and steel cable systems for the loading dock of the gas storage in Bergermeer, The Netherlands.

material

The membrane is made of the TX30 of Serge Ferrari, having a warranty of 25 years!

Project data:

Surface: Approximately 700 sqm
Material: Serge Ferrari TX 30 (type III en V)
Client: TAQA Onshore BV
Design: Jinx Architecten and Tentech
Tensioned membrane: Buitink Technology
Steel structure: Oving

Mounting membrane

Watch the movie and discover how the loading dock was installed:

 
Tensioned Membrane Bergermeer_08.jpg

Tensioned Membrane Bergermeer_09.jpg

Tensioned Membrane Bergermeer_03.jpg

Tensioned Membrane Bergermeer_04.jpg

Tensioned Membrane Bergermeer_06.jpg

Tensioned Membrane Bergermeer_07.jpg

Tensioned Membrane Bergermeer_10.jpg

Tensioned Membrane Bergermeer_11.jpg

Tensioned Membrane Bergermeer_13.jpg

Tensioned Membrane Bergermeer_14.jpg

Tensioned Membrane Bergermeer_15.jpg

Tensioned Membrane Bergermeer_16.jpg

Tensioned Membrane Bergermeer_18.jpg

Tensioned Membrane Bergermeer_19.jpg

 

Logo-Texyloop.jpg "Our waste materials and by-products are recycled by Texyloop"