In cooperation with and contracted by European Future Structures NV (Veldeman Goup) Buitink Technology realised a temporary tensioned membrane structure for the courtyard of Carrè des Arts in Mons (Belgium).

Dimensions and execution membrane construction

The tensioned membrane is composed of 5 separate modules, connected by (stainless) steel cables. Besides the configuration of 5 modules, it is also possible to install only 3 modules.

About 60x25 meters of the courtyard is covered by the structure. The membrane modules are assembled at ground level. When completed the membrane is lifted to it's final position by means of integrated lifting systems and are properly tensed.

In autumn the membranes are removed to be reinstalled in spring.

 
 
zeildoekconstructie_carre_01.jpg

zeildoekconstructie_carre_02.jpg

zeildoekconstructie_carre_03.jpg

 

Project data:

Surface: Approximately 1750 sqm membrane surface
Material: Ferrari 702
Client: Fédération Wallonie-Bruxelles
Architect: AGWA
Engineer: NEY + Partners/ BXL
Main contractor: Lixon
Engineering membranes: Tentech
Contractor Buitink: European Future Structures (Veldeman Group)
Tensioned membranes: Buitink Technology
 
membraanoverkapping_carre_des_arts_01.jpg

membraanoverkapping_carre_des_arts_02.jpg

membraanoverkapping_carre_des_arts_03.jpg

membraanoverkapping_carre_des_arts_04.jpg

membraanoverkapping_carre_des_arts_05.jpg

membraanoverkapping_carre_des_arts_06.jpg

membraanoverkapping_carre_des_arts_07.jpg

membraanoverkapping_carre_des_arts_08.jpg

 

Logo-Texyloop.jpg "Our waste materials and by-products are recycled by Texyloop"