French
English
Dutch
Home > Projects > Membrane bridge Floriade

Membrane bridge Floriade

Buitink Technology supplied and installed on behalf of AaDee Infrastructure Industry a tensioned membrane cover for the Floriade Bridge.

The Floriade membrane covered bridge has a total length of approximately 120 m, a width of 10 m and a height of approximately 4.5 m. The main bridge has a span of 60 m. The membrane bridge structure is equipped with a tensed membrane of approximately 1000 sqm.

To maintain the open character of the bridge, a relatively fine-meshed fabric has been used.

 
 
bekleding_brug_met_gaasdoek_01.jpg

bekleding_brug_met_gaasdoek_03.jpg

 

Project data

Material: Ferrari FT381
Architect: Gerard Extra
Main Contractor: Ballast Nedam
Contractor bridge: AaDee Infrastructure Industry BV
Stretched skin: Buitink Technology
 
bekleding_brug_met_gaasdoek_02.jpg

bekleding_brug_met_gaasdoek_05.jpg

bekleding_brug_met_gaasdoek_06.jpg

bekleding_brug_met_gaasdoek_08.jpg

bekleding_brug_met_gaasdoek_09.jpg

bekleding_brug_met_gaasdoek_10.jpg

 

More information

Buitink Technology is a resourceful company with original ideas and ingenious products. We are a pioneering company in manufacturing products such as membrane cover for bridges to meet your particular needs. You can visit our project overview section to check our line of products and get more information about membrane bridges. You can also give us a call +31 (0) 316-250830 or send an email: info@buitink-technology.com. Or just leave your contact information and we will contact you.

Logo-Texyloop.jpg "Our waste materials and by-products are recycled by Texyloop"