Air cushion roof for stages MDNA Tour 2012

In cooperation with and contracted by European Future Structures NV (Veldeman Goup) Buitink Technology has realised inflatable cushions as part of the roof structure of the four stages for the MDNA (Madonna) Tour in 2012. The inflatable roof structure was a combined development of the involved parties.
Main contractor Stageco Belgium NV has a strong worldwide reputation in stage building and organisation of tours and events.

One stage roof has a surface of approximately 1.100 sqm and consists of 11 separate cushions. Some of them have a size of 7x25 m! The cushions are filled with air and kept under pressure by means of a blower system, connected to the cushion-system with a plug-in connection system.

The MDNA Tourrequired totally four stages, for which Buitink Technology produced and delivered4.400 sqm of cushions.  The whole project was realised from design till delivery in no more than three months time, thanks to a smooth cooperation between the involved parties!

The choice for an inflatable roof system was made for several reasons. One of the reasons was simplicity of the erection; the cushions are slided into aluminium shotgun profiles mounted on the roof structure. The principle of this system is illustrated in a movie. It's the installation of another cushion project realised by Buitink Technology: installation air cushions swimmingpool De Krommerijn.

Another reason was that the roof had be virtually invisible for the audience. It's main purpose was  protection agains the weather, controlled draining of rain water and a stable contruction. Inflatable cushions for this application was the best choice.

 
 
inflatable air cushion roof MDNA 2012_01.jpg

Inflatable air cushions for MDNA Tour 2012

inflatable air cushion roof MDNA 2012_02.jpg

Inflatable air cushions for MDNA Tour 2012

 
inflatable air cushion roof MDNA 2012_03.jpg

Inflatable air cushions for MDNA Tour 2012

inflatable air cushion roof MDNA 2012_05.jpg

Inflatable air cushions for MDNA Tour 2012

 

Project data:

End client/ main contractor: Stageco Belgium N.V.
Client: European Future Structures NV (Veldeman Group), Bree, België
Air cushions with air system: Buitink Technology
Engineering cushions: Tentech BV

 

 
inflatable air cushion roof MDNA 2012_06.jpg

air cushions for MDNA Tour 2012

inflatable air cushion roof MDNA 2012_07.jpg

air cushions for MDNA Tour 2012

inflatable air cushion roof MDNA 2012_08.jpg

air cushions for MDNA Tour 2012

inflatable air cushion roof MDNA 2012_09.jpg

air cushions for MDNA Tour 2012

inflatable air cushion roof MDNA 2012_10.jpg

air cushions for MDNA Tour 2012

inflatable air cushion roof MDNA 2012_11.jpg

air cushions for MDNA Tour 2012

 

More information

If you would like to get detailed information about this project and receive personal advice, please give us a call or sent an email. You can also leave your contact information tol contact you.