French
English
Dutch
Home > Industry > Water drainage

Water drainage

By default, the mobile floor contains a water drain in one corner. This drain can be positioned above a pit (drain). In this way dirty water is collected (e.g. in an oil or grease trap).

Optionally we can provide a water pump. E.g. to collect waste water in an IBC container. We also can deliver the IBC container with shortcut to the pump.

The dirty water in the IBC can be cleaned on site or transported to a waste processing plant. See the video below.

 
 
pomp_01.jpg

pomp_04.jpg

 
pomp_05.jpg

pomp_06.jpg

 
pomp_08.jpg

pomp_07.jpg

 
pomp_03.jpg

 

More information

More information about the capabilities of our mobile wash pads? Call Buitink Technology: +31 316 25 08 30, email: info@buitink-technology.com or leave your contact information:







Use a space between the two words


Logo-Texyloop.jpg "Our waste materials and by-products are recycled by Texyloop"