Floats for bridge - Floating traffic bridge

On behalf of "BSB Staalbouw" Buitink Technology developed, produced and installed (inflatable) floats to transport a new table bridge from Sumar to Zuidhorn (Holland) using a  push and pull boat. The total transport distance was 45 kilometers.

Navigation course

The bridge has a length of 61 meter and weighs 300 tons. It was navigated trough the "Van Starkenborg" channel up to Zuidhorn. The advantage of using air inflatable cushions is the limited transport height of the bridge. As a result the cargo can pass below all existing bridges, impossible with conventional pontoons.

map-eng2.gif

 
 
drijvers_voor_brug.jpg

drijvers_voor_brug2.jpg

 
drijvers_voor_brug3.jpg

drijvers_voor_brug4.jpg

 

Engineering

In coöperation with "BSB Staalbouw" and "HEBO" the engineering plan was developed. All parties involved together investigated the location of the floats and the way it could be connected to the bridge. Critical variables were floating power and stability. Part of the investigation as well was a risk analysis on failure of one of the floats.

 
drijvers-brug1.jpg

drijvers-brug2.jpg

 

tekening_vr_website_eng.png

Production and installation

Buitink Technology produces the floating cushions in their production facities in Duiven (Holland). Air compressors to control the air pressure in the cushions during transport are produced and installed by Buitink Technology as well.

Mounting the floating bodie with ties to the bridge and connecting the air compressor installation was performed on the site of "BSB Staalbouw".

Operation

Buitink Technology was not only responsible for development, engineering and production but also was present during the operation. They were responsible for monitoring and control of the process.

 
floating_bridge_1.jpg

floating_bridge_2.jpg

 
 
 
brugdrijvers1.jpg

brugdrijvers2.jpg

brugdrijvers3.jpg

 

Project data:

Contractor: BSB Staalbouw
Floating bodies: Buitink Technology
 
floaters_for_bridge1.jpg

floaters_for_bridge2.jpg

floaters_for_bridge3.jpg

floaters_for_bridge4.jpg

floaters_for_bridge5.jpg

floaters_for_bridge6.jpg

 

More information

Are you looking for heavy material lifting of floating bags? Call Buitink Technology: +31 316 25 08 30, email: info@buitink-technology.com or leave your contact information:







Use a space between the two words

Logo-Texyloop.jpg "Our waste materials and by-products are recycled by Texyloop"