Courtyard of Carrè des Arts in Mons (Belgium)

In cooperation with and contracted by European Future Structures NV (Veldeman Goup) Buitink Technology realized a temporary tensioned membrane structure for the courtyard of Carrè des Arts in Mons (Belgium).

Dimensions and execution membrane construction

The tensioned membrane is composed of 5 separate modules, connected by (stainless) steel cables. Besides the configuration of 5 modules, it is also possible to install only 3 modules.

About 60x25 meters of the courtyard is covered by the structure. The membrane modules are assembled at ground level. When completed the membrane is lifted to it's final position by means of integrated lifting systems and are properly tensed.

In autumn the membranes are removed to be reinstalled in spring.

 
 

Project data:

Surface: Approximately 1750 sqm membrane surface
Material: Ferrari 702
Client: Fédération Wallonie-Bruxelles
Architect: AGWA
Engineer: NEY + Partners/ BXL
Main contractor: Lixon
Engineering membranes: Tentech
Contractor Buitink: European Future Structures (Veldeman Group)
Tensioned membranes: Buitink Technology
Year of implementation:  2014