French
English
German
Dutch
Home > Architecture > Facade cloths Almere train station

Facade cloths Almere train station

Buitink Technology replaced the full color tensioned wall cloth of Almere Centrum train station (the Netherlands).

The existing cloth had an insufficient resistance against the local wind conditions. As a result the cloth was released from the framework, started to rattle and finally ripped apart.

Nearly 1,000 square meters of cloth refers to the station's upcoming renovation. Almere Centrum will soon become the greenest station in the Netherlands.

 
 
1Geveldoeken-voor.jpg

Geveldoeken-na1.jpg

Geveldoeken-na2.jpg

 
 
 
Geveldoeken_Almere_station_1.jpg

Geveldoeken_Almere_station_2.jpg

 

Cloth tension

Pag-20.jpg

Aluminum profiles

Besides replacing the wall cloth including a new tensioning system, Buitink Technology strengthened the existing support structure/glass framework with Aluminum profiles.

 
 
Gevelbekleding-station1.jpg

Gevelbekleding-station2.jpg

Gevelbekleding-station3.jpg

 

details-EN.jpg

Project data wall cloth

Size:
36 wall cloth,total surface area of about 900 m2
Material: Frontside Print 371of Serge Ferrari
Client: ProRail
Advice: Movares
Wall cloth: Buitink Technology
Year of construction        : 2019

Link

material of construction Serge Ferrari

 
textielgevel_almere_1.jpg

textielgevel_almere_2.jpg

 

Location

Central Station, Almere (the netherlands)

locatie-afbeelding-station-almere.jpg

COVID-19 protection

Find out more about our innovative products and solutions for the 1.5 meter economy: cough-and spray shields (free standing or hanging) and BICS® vehicle shields; an optimum protection for yourself and your surroundings!

spatschermen